Ontario (ONT) | ICRL |
305-311 Rue Ontario E. | Montréal | H2X 1H7 |
Ville-Marie borough |
Date of acquisition: December 10 2021 |
Social housing with community support |
18 bedrooms equipped with a bed and fixed funishings, storage space, a sink and shared spaces. |
Construction start date: November 1 2022 |
![](https://vilavi.ca/wp-content/uploads/20220715_ONT_Exterieur-10-1024x576.jpg)
30 juin 2022: Appel d’offres SEAO – Rénovation et transformation des bâtiments au 305-311 rue Ontario, Montréal
![16 novembre 2022: réunion de démarrage. Chantier de rénovation majeure prévu pour une durée de 12 mois](https://vilavi.ca/wp-content/uploads/20221116_ONT_Reunion-de-demarrage-1-1024x540.jpg)
![](https://vilavi.ca/wp-content/uploads/20210721_ONT-6-scaled.jpg)
![](https://vilavi.ca/wp-content/uploads/20210721_ONT-1-scaled.jpg)